One-Dollar Test Wire Before the First Draw: The Odds
A new contractor gives wire details by email. The first draw is $18,000. Sending a dollar first and having the contractor confirm receipt takes ten minutes and a wire fee. The question is how likely a wrong account is for the test to pay.
The steps
- Price the test: minutes × the value of your time, plus the wire fee.
- Estimate the cost of a wrong first wire.
- Break-even chance = test cost ÷ wrong-wire cost.
- Verify the details by phone first (match the wire payee to the W-9).
A worked example
Example (illustrative arithmetic, not predictions)
The test costs 10 minutes of time and fees, $10 in all. A wrong first wire would cost $2,000 if not recovered. Every figure is a made-up round number.
| Chance the account details are wrong | Expected loss avoided (chance × $2,000) | Avoided − $10 |
|---|---|---|
| 0.25% | $5 | −$5 |
| 0.5% | $10 | $0 (break-even) |
| 2% | $40 | +$30 |
| 5% | $100 | +$90 |
The test pays at a 0.5% chance of wrong details: $10 ÷ $2,000. With spoofed emails common in construction payments, that is plausible.
Verify the details by calling a known number first, then agree the test with the contractor, send the dollar and get confirmation of receipt from the contractor by a separate channel. Only then send the draw. The test does not replace the phone verification.
Making it routine
- Verify the details by calling a known number.
- Agree the test with the contractor.
- Send a dollar and get confirmation.
- Then send the draw.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the size of a first draw a test wire protects.