Minimum Loan Size: Does the Loan Pay for Your Time?

By DeskTech HQ · · 2 min read

A $25,000 loan and a $150,000 loan both need a title review, a closing, a draw plan and a payoff. The work is close to the same. The income is not, and that is why a minimum loan size is worth setting before the small loans arrive.

The steps

  1. Estimate the hours one loan takes: fixed work plus monthly servicing (servicing).
  2. Compute the income you expect to keep: interest collected plus points (effective yield).
  3. Subtract your out-of-pocket cost per loan.
  4. Divide the net by the hours.
  5. Solve for the loan size that earns the hourly figure you need.

A worked example

Example (illustrative arithmetic, not market data)

Interest 11% a year, 2 points, a 9-month term. Interest is collected on an average of 75% of the loan because it is drawn in stages. Fixed work is 20 hours, plus 1.5 hours a month of servicing, so 20 + 13.5 = 33.5 hours. Out-of-pocket cost is $600 per loan. Every figure is a made-up round number.

Loan Interest (75% average) Points Net after $600 Per hour (33.5 hours)
$25,000 $2,062.50 $500 $1,962.50 $58.58
$60,000 $4,950 $1,200 $5,550 $165.67
$150,000 $12,375 $3,000 $14,775 $441.04

The $150,000 loan is 6 times the size of the $25,000 loan and earns 7.5 times as much net, because the $600 and the hours do not grow with it. To earn at least $100 an hour, the net must reach 33.5 × $100 = $3,350, so income of $3,950 with the $600 cost. Income is 0.11 × 0.75 + 0.02 = 10.25% of the loan, so the minimum loan is $3,950 ÷ 0.1025 = about $38,537. Below that, the loan pays less than $100 an hour in this example.

This does not mean small loans are always wrong. A new borrower, a short deal, or a strong referral may justify one. It means you know the price of that choice (third-party servicer).

Making it routine

  1. Track your real hours on the next three loans.
  2. Set a minimum loan size or minimum fee from the result.
  3. Put it in your written terms (fee schedule).
  4. Review it once a year.

Run your own numbers

Use the free fix-and-flip loan sizer below to test loan amounts, then compare the income with your own hours.

Quick answers

Why does loan size matter if the rate is the same?

Most of the work of a loan is the same at any size: review, closing, draws, payoff. Income scales with the amount lent, while the hours do not, so small loans earn less per hour.

How do I count my hours?

Write down the real time for one recent loan: underwriting, closing, each draw, monthly servicing and payoff. Use your own numbers, not the ones in this guide.

Is a minimum loan size the same as a minimum fee?

They solve the same problem. A minimum loan size screens out small loans, and a minimum fee makes them pay for the fixed work. Disclose either clearly ([fee schedule](/blog/lender-fee-schedule-clear-and-consistent)).

Should I count the interest I do not receive until payoff?

Use only the interest you expect to collect over the loan's term, and the share that you keep after any servicer or partner is paid.

Do the numbers in this guide apply to my loans?

No. The rate, points, hours and costs are made up for the example. They are not market data or advice about any loan.

Keep reading

Private and hard money lending

Loan-Level Profit: What Each Loan Really Earned

Learn how to compute each private loan's profit after your time, outside costs and cost of capital, and see how one troubled loan changes the book.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.