Finished-House Bridge Loan: How Much Lower Can the Rate Go?

By DeskTech HQ · · 2 min read

A borrower finishes a rehab and needs 90 days to sell. The construction loan is nearly paid off, and a new, shorter loan on the finished house would carry less risk: no work to finish, no draws, a value you can see. The question is how much lower the rate can be and still earn what the rehab loan did.

The steps

  1. Estimate the chance of default and the loss if it happens for each loan type.
  2. Multiply to get the expected loss as a share of the balance.
  3. Compute the net income of the rehab loan: interest less expected loss.
  4. Find the rate on the finished-house loan that gives the same net income.
  5. Check that the other costs are consistent, and apply the same pricing to every borrower (pricing by risk tier).

A worked example

Example (illustrative arithmetic, not benchmarks)

Two loans of $150,000 for six months. The rehab loan carries an 11% rate, a 5% chance of default and a 35% loss if it happens: expected loss 1.75% of the balance, $2,625. The finished-house bridge has a 2% chance of default and a 25% loss: expected loss 0.5%, $750. Every figure is a made-up round number.

Rehab loan net: $150,000 × 11% × 6 ÷ 12 = $8,250 interest, less $2,625 = $5,625.

Bridge rate Interest (6 months) Less $750 expected loss Net vs rehab loan ($5,625)
11.0% $8,250 $7,500 +$1,875
9.5% $7,125 $6,375 +$750
8.5% $6,375 $5,625 $0
8.0% $6,000 $5,250 −$375

An 8.5% bridge rate earns the same net income as the 11% rehab loan, once the lower expected loss is counted. That is the floor for the comparison; a lender who wants more than the rehab loan earned prices above it. At 9.5% the bridge still earns $750 more. The example shows that a lower rate on a safer loan is not a gift; it is the same return for less risk.

The comparison assumes the lower default and loss rates are real, and that requires evidence: how finished-house loans have performed for you, and what a quick sale of a finished house recovers. It also ignores costs: a bridge loan needs less servicing (no draws or inspections), which makes room for a lower rate, and an appraisal or broker’s opinion, which adds cost. Document the basis for any rate difference and apply it to every borrower the same way (LTV cushion).

Making it routine

  1. Track default and loss by loan type.
  2. Price from the record, not from habit.
  3. Apply the same pricing to every borrower of the same type.
  4. Confirm rate and disclosure rules with an attorney.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the interest on a bridge loan at different rates.

Quick answers

Why would a loan on a finished house cost less?

The work is done, so there is no construction risk, no draws and often a clearer value. The expected loss is lower.

How do I turn lower risk into a lower rate?

Compare the expected loss of each loan, then find the rate on the finished-house loan that gives the same net income.

Is the lower rate always right?

No. Other costs and the borrower matter. Price on documented loan-level risk, applied the same way to every borrower.

Are there limits or disclosure rules?

Yes. They differ by state and loan type. Confirm with a qualified attorney.

Do the numbers in this guide apply to my loans?

No. The default and loss rates are made up for the example. They are not benchmarks.

Keep reading

Private and hard money lending

Minimum Loan Size: Does the Loan Pay for Your Time?

Learn how to estimate what a small private loan earns per hour of your work, and how to find the loan size below which the effort is not worth it.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.