Mobile Notary or Office Signing? What Days Saved Are Worth
The loan is approved and the documents are ready. The borrower can sign at the office on Thursday or at their kitchen table on Tuesday with a mobile notary for an extra fee. The two days are worth something to both sides. The question is how much.
The steps
- Get the mobile notary’s fee.
- Value a day saved for the lender: the loan amount times the rate, divided by 365.
- Value a day saved for the borrower: its holding cost per day, if work can start sooner (holding costs).
- Add the two and divide the fee by the total. That is the days needed to break even.
- Confirm the signing method with the closing agent.
A worked example
Example (illustrative arithmetic, not quotes)
A $150,000 loan at 11%: a day of interest is $150,000 × 11% ÷ 365 = $45.21. The borrower’s holding cost is $150 a day. The mobile notary charges $150. Every figure is a made-up round number.
Value of a day saved to both sides: $45.21 + $150 = $195.21. Break-even: $150 ÷ $195.21 = 0.77 days.
| Days saved | Value (× $195.21) | Notary fee | Net |
|---|---|---|---|
| 0 | $0 | $150 | −$150 |
| 1 | $195 | $150 | +$45 |
| 2 | $390 | $150 | +$240 |
| 3 | $586 | $150 | +$436 |
If the notary saves even one day, it pays for itself across the two sides. If it saves none, it is a waste. Who pays matters: the fee usually falls on one party, and the benefit falls partly on the other, so it is common for the borrower to pay, since most of the benefit is theirs. Check what the loan documents and local rules allow.
The bigger question is validity. A document that is not properly notarized can fail to record or be challenged later. A mobile notary must be commissioned, must follow the identification rules and must complete the journal and certificate correctly. Use one the closing agent knows, and let the closing agent say whether remote or mobile signing is acceptable for your documents (closing out a private money loan).
Making it routine
- Offer a mobile notary when a day or more would be saved.
- Use a notary your closing agent works with.
- Confirm the signing method before the date.
- Record how many days it saved.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the daily interest on a loan.