Pest Control: Annual Plan vs Per Treatment

By DeskTech HQ · · 1 min read

A rental with a recurring pest problem will need repeated treatments. An annual plan costs a fixed amount. Per-treatment pricing costs more each time but nothing when no one is called. The break-even is the number of treatments.

The steps

  1. Get the annual plan price and the per-treatment price.
  2. Break-even treatments = plan price ÷ per-treatment price.
  3. Compare with the treatments your property needs in a year (snow removal contract vs per visit).

A worked example

Example (illustrative arithmetic, not quotes)

The plan costs $360 a year. One treatment costs $120. Every price is a made-up round number.

Treatments needed in a year Per-treatment total (× $120) Plan − per-treatment
2 $240 +$120 (per-treatment cheaper)
3 $360 $0 (break-even)
4 $480 −$120 (plan cheaper)
6 $720 −$360 (plan cheaper)

The plan wins from the fourth treatment: $360 ÷ $120. A unit with a seasonal ant problem might need two treatments and is better off paying per visit. A multi-unit building with roaches may need monthly service.

A plan often includes call-backs at no charge, which a per-treatment price does not. Read what the plan covers and what it excludes. For an occupied unit, give notice and prepare the unit as the provider requires (lawn care in the lease).

Making it routine

  1. Log each pest call by unit.
  2. Get both prices in writing.
  3. Compute the break-even treatments.
  4. Use a licensed provider.

Run your own numbers

Use the free BRRRR calculator below to see how a yearly maintenance cost changes a rental’s cash flow.

Quick answers

How do I find the break-even number?

Divide the annual plan price by the price of one treatment.

Does a plan prevent problems?

Regular treatment can reduce them. It does not guarantee none.

Do I have to tell tenants?

Often yes, before treating an occupied unit. Check local rules.

Who must be licensed?

Pest control is licensed in most states. Use a licensed provider.

Do the numbers in this guide apply to my property?

No. The prices are made up for the example. They are not quotes.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.