Furnace Tune-Up at Turnover: The Mid-Winter Failure Odds
A furnace that fails on the coldest night brings an emergency call, a higher bill and an unhappy tenant. A tune-up before the season costs a flat fee. The question is how likely a breakdown is, over the winter, for the tune-up to pay.
The steps
- Price the tune-up: the service fee.
- Price a winter emergency call: after-hours rate, parts and tenant goodwill.
- Break-even chance = tune-up cost ÷ emergency cost.
- Compare with the age of the furnace (a capex reserve by system age).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The tune-up costs $90. A mid-winter emergency call would cost $400. Every figure is a made-up round number.
| Chance of a breakdown this winter without the tune-up | Expected emergency cost avoided (chance × $400) | Avoided − $90 |
|---|---|---|
| 10% | $40 | −$50 |
| 22.5% | $90 | $0 (break-even) |
| 40% | $160 | +$70 |
| 60% | $240 | +$150 |
The tune-up pays at a 22.5% chance of a breakdown: $90 ÷ $400. For an old furnace in a cold climate, that is plausible. For a new one, it is not.
Time the tune-up with turnover so the unit is empty and the technician has access. Ask the technician for a written report, including a carbon monoxide check, and keep a log of each furnace’s age and service dates.
Making it routine
- List each furnace’s age and last service.
- Tune up old furnaces at turnover.
- Get a written report with a safety check.
- Keep detectors working.
Run your own numbers
Use the free BRRRR calculator below to see how a heating repair changes a rental’s yearly cash flow.