Fix Window Screens at Turnover: The Callback Odds
Torn or missing screens are a common first-month request from a new tenant. Fixing them at turnover takes minutes. Waiting for the request costs a trip. The question is how likely a call is for the turnover fix to pay.
The steps
- Price the turnover fix: parts plus minutes of work.
- Price a later service call: the trip plus the work.
- Break-even chance = turnover fix cost ÷ service call cost.
- Compare with how often new tenants ask for screens (the cost of turnover).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The turnover fix costs $15 in parts and time. A later service call costs $75. Every figure is a made-up round number.
| Chance a new tenant would call about the screens | Expected call cost avoided (chance × $75) | Avoided − $15 |
|---|---|---|
| 10% | $7.50 | −$7.50 |
| 20% | $15.00 | $0 (break-even) |
| 40% | $30.00 | +$15.00 |
| 60% | $45.00 | +$30.00 |
The turnover fix pays at a 20% chance of a later call: $15 ÷ $75. Torn screens are visible at move-in, and most new tenants ask. The chance is likely well above 20%.
Check every window at turnover, not only the ones with screens, and note any that do not open or lock. A stuck window is a safety and egress question that no screen repair addresses (a capex reserve by system age).
Making it routine
- Check every window at turnover.
- Fix screens while the unit is empty.
- Note windows that stick or do not lock.
- Log the cost and the date.