Code Violations and Open Permits: Check Before You Lend
The title commitment came back clean. Six months later the city sends a notice of an open violation on the property with a $6,500 fine that is accruing, and a permit for the deck that was never closed. Neither showed up on the title search.
The steps
- Ask the title company which municipal and permit records its search covers, and ask the local government what it can provide.
- Run a records check by address for open violations, fines and unclosed permits (underwriting checklist).
- Record what you find, or that nothing was found, in the loan file (loan file checklist).
- If something is open, require it to be resolved or reserved for before funding.
- Ask your attorney how the item affects your lien position.
A worked example
Example (illustrative arithmetic, not municipal fees)
A records check costs $75 a property. You close 40 loans a year, and one in twenty (5%) has an open item worth $6,500 that could end up ahead of or alongside your loan. Every figure is a made-up round number.
| Item | Per year |
|---|---|
| Cost of checking 40 properties (40 × $75) | $3,000 |
| Properties with an open item (5% × 40) | 2 |
| Exposure from those two (2 × $6,500) | $13,000 |
| Exposure avoided if every one is found and resolved | $13,000 |
| Net benefit of checking | $10,000 |
| Break-even incidence ($75 ÷ $6,500) | 1.15% |
The check pays for itself if more than about 1 property in 87 has an open item of that size. At a 5% rate it returns more than four times its cost. It pays more on older properties and on those with recent work, and less on newly built ones (unpermitted work).
Exposure is not always loss. Some items are cured by the borrower, some are small, and some rank behind your lien. The point is that you cannot tell which until you look, and what you find changes whether you fund and how you size the holdback (lien position).
Making it routine
- Add a municipal records check to every new loan, for the same reasons each time.
- Record the result in the loan file even when it is clean.
- Ask the borrower to close out permits before the final draw (permits and inspections).
- Review the cost and the findings once a year.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the loan amount any open item would sit against.