Pool or Hot Tub Inspection Before an Offer: The Odds

By DeskTech HQ · · 1 min read

A pool looks like an amenity and can be a liability. A leaking shell, a failing pump or a missing fence can cost thousands. A pool inspection costs about a hundred dollars. The question is how likely a hidden problem is for the inspection to pay.

The steps

  1. Price the inspection: the inspector’s fee.
  2. Estimate the cost of a hidden pool problem: repair, code work, higher insurance.
  3. Break-even chance = fee ÷ problem cost.
  4. Check the insurance and the safety rules (insuring a flip: vacant property basics).

A worked example

Example (illustrative arithmetic, not predictions)

The inspection costs $120. A hidden pool problem would cost $6,000. Every figure is a made-up round number.

Chance of a hidden pool problem Expected loss avoided (chance × $6,000) Avoided − $120
1% $60 −$60
2% $120 $0 (break-even)
5% $300 +$180
10% $600 +$480

The inspection pays at a 2% chance of a hidden problem: $120 ÷ $6,000. For an older pool or one that has sat unused, the chance is much higher.

Hire a qualified pool inspector who checks the shell, plumbing, pump, heater and electrical safety and the fence, gate and alarms. Ask your insurer what it requires. Decide whether you want to keep the pool, fill it or fence it before you set your price.

Making it routine

  1. Hire a qualified pool inspector.
  2. Check the shell, equipment and fence.
  3. Ask your insurer what it requires.
  4. Decide whether to keep, fill or fence it.

Run your own numbers

Use the free MAO calculator below to see how a pool repair or removal changes the most you can offer.

Quick answers

Why inspect a pool?

Pools hide leaks, cracked shells and failing equipment that cost thousands.

How do I price the inspection?

The inspector's fee.

What is the break-even chance?

The fee divided by the cost of the hidden problem.

What about safety rules?

Fences, gates and covers are often required.

Do the numbers in this guide apply to my deal?

No. The fee, loss and odds are made up for the example. They are not predictions.

Keep reading

Deal analysis

Ask About a Solar Lease Before an Offer: The Odds

Learn how to price a ten-minute check for a solar panel lease or financing lien on a roof before you offer and find the chance it exists that makes it pay.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.