Postcards to Find Borrowers: The Funded Rate That Pays

By DeskTech HQ · · 1 min read

A postcard costs under a dollar, and a loan earns thousands. That gap is why direct mail can pay even when almost no one responds. The question is how small the funded rate can be.

The steps

  1. Total the cost of the mailing: print, postage and list.
  2. Take the profit on one funded loan.
  3. Break-even funded rate = mailing cost ÷ (pieces mailed × loan profit).
  4. Compare with the rate you have seen on past mailings (cost per funded loan by channel).

A worked example

Example (illustrative arithmetic, not benchmarks)

A mailing of 500 postcards costs $0.85 each, $425. A funded loan earns $3,000. Every figure is a made-up round number.

Share of pieces that end in a funded loan Loans funded (of 500) Profit Profit − $425
0.01% 0.05 $150 −$275
0.028% 0.14 $425 $0 (break-even)
0.1% 0.5 $1,500 +$1,075
0.2% 1 $3,000 +$2,575

The mailing pays at about three funded loans in 10,000 pieces: $425 ÷ ($3,000 × 500). One loan from five hundred cards covers it six times over.

That is the average. A single mailing usually produces zero or one loan, so the result swings. Measure over several mailings, not one, and track how many replies become funded loans (referral fees and lender yield).

Making it routine

  1. Track every mailing and every loan it produces.
  2. Mail in batches large enough to measure.
  3. Compute the funded rate across batches.
  4. Have the piece and list reviewed before mailing.

Run your own numbers

Use the free fix-and-flip loan sizer below to see what one funded loan earns.

Quick answers

What is the break-even funded rate?

The mailing cost divided by the pieces mailed times the profit on a loan.

Why is the rate so small?

A loan earns a lot more than a postcard costs.

Are there rules for mailers?

Yes: advertising, licensing and disclosure rules vary by state.

Should the mailing be reviewed?

Yes. Have a qualified professional or attorney review the wording and list.

Do the numbers in this guide apply to my mailing?

No. The cost and profit are made up for the example. They are not benchmarks.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.