Cost per Funded Loan: Which Marketing Channel Pays?
Marketing reports usually count inquiries. A lender lives on funded loans. A channel that brings many inquiries and few loans can cost more per loan than one that brings a few good ones. The question is how to compare them fairly.
The steps
- For each channel, total the spend over a period: ads, fees, events, time.
- Count the loans that channel funded in the same period.
- Divide spend by loans. That is the cost per funded loan.
- Subtract it from the net income on a typical loan (loan-level profit).
- Compare channels by net per loan and by how many loans each can deliver (deal sourcing funnel).
A worked example
Example (illustrative arithmetic, not benchmarks)
A loan nets $5,000. Three made-up channels over a quarter. Every figure is a made-up round number.
| Channel | Spend | Funded loans | Cost per loan | Net per loan (− from $5,000) |
|---|---|---|---|---|
| Ads | $2,000 | 2 | $1,000 | $4,000 |
| Referral fees | $2,000 | 4 | $500 | $4,500 |
| Events | $1,500 | 0.5 | $3,000 | $2,000 |
On these numbers, referrals earn the most per loan, ads next and events least. Ads generated many more inquiries than referrals, but two funded loans for $2,000 costs twice as much per loan as four funded through referral fees. If events brought a loan only every other quarter, they cost $3,000 per loan, which is still positive but far less than the others.
Two cautions. First, volume matters as well as cost per loan: a channel with a low cost per loan but a ceiling of two loans a year cannot fill a pipeline alone. Second, quality matters: a channel that brings borrowers who default more often costs more than the table shows. Track outcomes by channel, not just funding. And check the rules: advertising claims, referral payments and unsolicited contact each have legal limits that an attorney should review (referral fee: what it takes from yield).
Making it routine
- Tag every inquiry with its source.
- Track funded loans and later outcomes by source.
- Recompute cost per funded loan each quarter.
- Have an attorney review advertising and referral terms.
Run your own numbers
Use the free fix-and-flip loan sizer below to see the income on a typical loan.