Paying a Referral Fee: What It Takes From Your Yield
A broker offers to bring you borrowers for one point on each loan. One point looks small next to a 2-point fee and 11% interest. Subtract it from the yield and see what is left.
The steps
- Total what the loan earns you: points plus interest over the time it is outstanding (effective yield).
- Subtract the referral fee.
- Express the result as a share of the loan and as a yearly rate.
- Repeat for a loan that pays off early.
- Compare the cost with other ways of finding borrowers (sourcing funnel).
A worked example
Example (illustrative arithmetic, not an offer)
A $120,000 loan at 11% interest with 2 points. The referral fee is 1 point, $1,200. Every figure is a made-up round number.
| Item | Runs 9 months | Pays off at month 4 |
|---|---|---|
| Points (2%) | $2,400 | $2,400 |
| Interest | $9,900 | $4,400 |
| Income before referral | $12,300 | $6,800 |
| Referral fee | −$1,200 | −$1,200 |
| Net income | $11,100 | $5,600 |
| Net as a share of the loan | 9.25% | 4.67% |
| Net as a yearly rate | 12.3% | 14.0% |
| Fee as a share of income | 9.8% | 17.6% |
The fee takes 9.8% of the income on the full-term loan and 17.6% on the early payoff, because the fee is fixed while the interest stops. Over nine months the loan’s yearly yield falls from 13.7% to 12.3%, a drop of 1.3 points (pricing by risk tier).
Now add a loss. If one loan in twenty loses $15,000, the average cost is $750 a loan, and the full-term net falls from $11,100 to $10,350, or 8.6% of the loan. A fee that looked like 1 point can take a much bigger bite from a thin margin (loss reserves).
The broker may well be worth it if the loans are good and you could not find them yourself. The point is to know the price before agreeing, and to make sure the arrangement is permitted (fee schedule).
Making it routine
- Ask your attorney whether the arrangement is allowed and what must be disclosed.
- Write the fee terms down, including what happens on early payoff or default.
- Track the yield and the loss rate on referred loans separately.
- Review the arrangement once a year.
Run your own numbers
Use the free fix-and-flip loan sizer below to test loan size and income before you agree to a fee.