Pour Water Into the Sump Pit at Turnover: The Odds
A sump pump sits idle most of the year. The first time it is asked to work might be the night of the worst storm. Pouring a bucket of water into the pit at turnover takes three minutes and shows whether it starts. The question is how likely a dead pump is for the test to pay.
The steps
- Price the test: minutes × the value of your time.
- Estimate the cost of a dead pump in a storm: cleanup, damaged goods, tenant loss.
- Break-even chance = test cost ÷ storm cost.
- Consider a backup (sump pump battery backup).
A worked example
Example (illustrative arithmetic, not quotes or predictions)
The test takes 3 minutes at $60 an hour: $3. A dead pump in a storm would cost $1,500. Every figure is a made-up round number.
| Chance the pump is dead | Expected storm cost avoided (chance × $1,500) | Avoided − $3 |
|---|---|---|
| 0.1% | $1.50 | −$1.50 |
| 0.2% | $3.00 | $0 (break-even) |
| 1% | $15.00 | +$12.00 |
| 3% | $45.00 | +$42.00 |
The test pays at a 0.2% chance of a dead pump: $3 ÷ $1,500. Pumps that have sat idle for a year or two fail more often than that.
Pour in a bucket of water and watch the float rise, the pump start, the pit empty and the pump shut off. Check that the discharge line runs outside and is not blocked. If the pump does not run, call a plumber.
Making it routine
- Pour a bucket of water into the pit.
- Watch it start, empty and shut off.
- Check the discharge line outside.
- Call a plumber if it fails.
Run your own numbers
Use the free BRRRR calculator below to see how a flood claim changes a rental’s cash flow.