Pre-Offer Contractor Walk-Through: Worth the Fee?

By DeskTech HQ · · 2 min read

Your offer is only as good as your rehab estimate. If the estimate is $8,000 too low, so is your margin. A contractor’s walk-through before you offer costs a little. The question is how likely your own estimate is to be wrong by enough to justify it.

The steps

  1. Get the fee for a paid walk-through.
  2. Estimate the size of an error you might make on a house like this.
  3. Divide the fee by the size of the error. That is the break-even chance.
  4. Compare it with how often your estimates have been off by that much (rehab budget).
  5. Walk the house with the contractor, and ask them to name what could surprise you.

A worked example

Example (illustrative arithmetic, not quotes)

The fee is $250. An estimate error that a walk-through would catch is about $8,000. Every figure is a made-up round number.

Chance your own estimate is off by $8,000 Expected error (× $8,000) Fee Net
2% $160 $250 −$90
3.1% $250 $250 $0
10% $800 $250 +$550
Break-even $250 ÷ $8,000 = 3.1%

If you think there is a 3% chance or more that your own estimate will be off by $8,000, the walk-through pays on these numbers. For an experienced flipper looking at a cosmetic house, the chance may be below that. For a house with a possible foundation, roof or system problem, or for someone new to estimating, it is well above.

The walk-through is also a way to start a relationship with a contractor you may hire. Ask for the scope in writing, even informally, and compare it with your own (write a rehab scope of work). If the two differ a lot, find out why before the offer deadline.

Making it routine

  1. Keep a record of estimate versus actual on every project.
  2. Use the record to set when you pay for a walk-through.
  3. Ask the contractor what could surprise you.
  4. Verify license and insurance before relying on anyone.

Run your own numbers

Use the free MAO calculator below to see how a change in rehab cost changes the most you can offer.

Quick answers

Why pay a contractor to walk a house before I offer?

An experienced eye can catch costs you would miss. Since your offer depends on the rehab estimate, an error flows straight into your profit.

How do I decide whether it is worth it?

Divide the fee by the size of the estimate error it could catch. The result is the chance of such an error at which the walk-through pays.

Does a walk-through give a binding bid?

Usually not. It is an opinion of likely cost. Hidden conditions can change a bid after work starts.

Who should I ask?

A licensed contractor you trust, with experience in your kind of project. Check licensing and insurance.

Do the numbers in this guide apply to my deal?

No. The fee and the error size are made up for the example. They are not quotes.

Keep reading

Rehab budgeting

Contingency Burn: Used vs Percent Complete

Learn how to compare the share of a rehab contingency you have used with the share of the work finished, and project whether the contingency will last.

· 2 min read
Rehab budgeting

GC Markup vs Managing the Trades Yourself

Learn how to compare a general contractor's markup with the hours and mistakes of managing the trades yourself, and when self-management costs more.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.