Fixture Allowances: Set a Number Before You Shop

By DeskTech HQ · · 2 min read

Nobody plans to overspend on a light fixture. It happens one choice at a time: a nicer faucet, a better vanity, a pendant that looks right. Each is a few hundred dollars. By the end the selections have cost thirty percent more than the line in the budget.

The steps

  1. List the categories of finish items you have not chosen yet.
  2. Set an allowance for each before you shop, from past projects or from pricing a few options.
  3. Shop within the allowance.
  4. Track each category’s actual against its allowance as you buy (weekly scorecard).
  5. If one goes over, find a saving elsewhere or accept the lower profit knowingly.

A worked example

Example (illustrative arithmetic, not quotes)

Four categories, with allowances set at $3,000 in total, and what was actually chosen. Every figure is a made-up round number.

Category Allowance Chosen Over Over (%)
Lighting $900 $1,250 $350 38.9%
Plumbing fixtures $800 $900 $100 12.5%
Hardware $300 $350 $50 16.7%
Vanities $1,000 $1,400 $400 40%
Total $3,000 $3,900 $900 30%

No single choice looks extravagant. The lighting was $350 over, the vanities $400. Together they add $900, 30% of the allowance, and that $900 comes straight out of profit. On a flip with a $25,000 margin, it is 3.6% of the margin, lost on four categories of items.

The allowance does two things. It gives you a number to shop against, which stops a choice from looking small. And it makes the overrun visible at the moment you buy, when you can still choose a cheaper lamp. Without it, the same drift appears later as a variance in the final accounting, when it is too late to act (profit variance analysis).

Set the allowances from your own past projects. After a few, you will know what a bathroom’s fixtures usually cost for the kind of buyer you sell to, and you will notice when a choice is outside that.

Making it routine

  1. Set allowances before shopping, by category.
  2. Keep a running total of choices against them.
  3. Decide on trade-offs between categories on purpose.
  4. Record actual against allowance at closeout.

Run your own numbers

Use the free MAO calculator below to see how a rehab cost overrun changes the most you can offer next time.

Quick answers

What is an allowance?

A set amount in the budget for a category of items you have not yet chosen, such as lighting or plumbing fixtures.

Why set allowances?

Finish choices are made one at a time, and each looks small. Without a number to shop against, they drift upward.

How do I set one?

Look at what similar flips spent, or price a few options of the kind your buyer expects, and set the number before shopping.

What if I go over in one category?

Find the saving in another, or accept a lower profit knowingly. The point is to notice.

Do the numbers in this guide apply to my project?

No. The allowances and prices are made up for the example. They are not quotes.

Keep reading

Rehab budgeting

Pre-Offer Contractor Walk-Through: Worth the Fee?

Learn how to weigh the cost of a paid contractor walk-through before you offer against the rehab estimate error it can catch, and the odds that favor it.

· 2 min read
Rehab budgeting

Contingency Burn: Used vs Percent Complete

Learn how to compare the share of a rehab contingency you have used with the share of the work finished, and project whether the contingency will last.

· 2 min read
Rehab budgeting

GC Markup vs Managing the Trades Yourself

Learn how to compare a general contractor's markup with the hours and mistakes of managing the trades yourself, and when self-management costs more.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.