Read the Water Meter With Every Tap Off at Turnover

By DeskTech HQ · · 1 min read

A toilet runs, a pipe weeps behind a wall or a line leaks underground, and the water meter spins. When the owner pays the water bill, that is your money. Closing every tap and checking the meter takes five minutes at turnover. The question is how likely a hidden leak is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Estimate the cost of a hidden leak left to run: water and damage.
  3. Break-even chance = check cost ÷ leak cost.
  4. Pair it with the flapper check (replace the toilet flapper at turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The check takes 5 minutes at $60 an hour: $5. A hidden leak left to run would cost $500. Every figure is a made-up round number.

Chance of a hidden leak Expected cost avoided (chance × $500) Avoided − $5
0.5% $2.50 −$2.50
1% $5.00 $0 (break-even)
3% $15.00 +$10.00
6% $30.00 +$25.00

The check pays at a 1% chance of a hidden leak: $5 ÷ $500. In a building with old pipes and several toilets, the chance is higher.

Turn off every tap and appliance that uses water, note the meter dial or low-flow indicator, wait a few minutes and look again. If it moves, check toilets first, then look for wet spots and call a plumber. Photograph the reading for your records.

Making it routine

  1. Turn off all taps and water-using appliances.
  2. Note the meter, wait and check again.
  3. Check toilets first if it moves.
  4. Call a plumber for what you cannot find.

Run your own numbers

Use the free BRRRR calculator below to see how a small yearly water saving adds up across a building.

Quick answers

How does the meter show a leak?

If the dial moves with every tap and appliance off, water is leaking somewhere.

How do I price the check?

The minutes times the value of your time.

What is the break-even chance?

The cost divided by the cost of a hidden leak.

Where is the meter?

Usually outside near the street or in the basement.

Do the numbers in this guide apply to my rental?

No. The cost and leak cost are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.