Rehab Budget Review: Is the Holdback Big Enough?

By DeskTech HQ · · 2 min read

On a rehab loan, the holdback is a promise to finish the work. That promise is only as good as the budget behind it. A quick review before funding can catch a budget that is short before it becomes a stalled project.

What to compare

  1. The borrower’s budget.
  2. A written contractor bid and the scope of work (how to write a scope of work).
  3. A contingency for the unknown (rehab estimates).
  4. The holdback in the loan terms (interest reserves).
  5. The value the project is expected to add.

A worked example

Example (illustrative arithmetic, not market data)

Assume a $120,000 purchase, an expected finished value of $225,000, a borrower budget of $40,000 and a holdback request of $40,000. The contractor’s written bid is $42,400, and the lender adds a 10% contingency (an assumption). Every figure is a made-up round number.

Check Calculation Amount
Contractor bid given $42,400
Contingency, 10% 10% × $42,400 $4,240
Budget needed $42,400 + $4,240 $46,640
Holdback requested given $40,000
Shortfall $46,640 − $40,000 $6,640
Value gain $225,000 − $120,000 $105,000
Gain per dollar of rehab $105,000 ÷ $46,640 2.25
Rehab as a share of value $46,640 ÷ $225,000 20.7%

The holdback leaves a $6,640 gap against the bid plus contingency. The value gain is 2.25 times the rehab cost, so the project still looks sound if the gap is filled. The lender might require the borrower to put in the $6,640 from their own cash, reduce the scope or reduce the loan.

What to do with a gap

  1. Ask for the gap to be funded in cash before the first draw.
  2. Hold that cash in a separate account or have it spent first.
  3. Document the decision in the loan file (a pre-funding checklist).
  4. Review the budget again at each draw (reviewing a draw request).

Size the loan against the deal

Use the free loan sizer below to compare the loan and the holdback with the expected value.

Quick answers

Why should a lender review the rehab budget?

The holdback is sized from the budget. If the budget is too low, the project can run out of money before the work is done, which leaves the lender with a half-finished property as collateral.

What should the budget be compared with?

A written bid from the contractor who will do the work, and the scope of work behind it. A budget with no bid or scope is an estimate and not a check.

What is a contingency in a lender's review?

It is an amount added to the bid for costs nobody has found yet. A lender may require the budget or the borrower's own cash to cover one.

What is the value gain test?

It compares the increase in value from the project with the cost of the rehab. If the work adds much less value than it costs, the project may not support the loan.

Do the numbers in this guide apply to my loans?

No. The examples are illustrative arithmetic with round numbers, including the 10% contingency, which is an assumption and not a standard. Each lender sets its own requirements.

Keep reading

Draw management

A Better Draw Request Form: Payback on Time Saved

Learn how to price the time a clearer draw request form saves by cutting returned and incomplete requests, and how many months it takes to pay for itself.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.