Rehab Estimates: Per Square Foot vs Line Item

By DeskTech HQ · · 2 min read

Two investors can look at the same house and get two very different rehab numbers. One multiplies square feet by a rate. The other adds up every item. Each method has a job, and the best results come from knowing which job.

The two methods

  • Per square foot. Fast and good for screening many properties. It hides the details, so two homes with the same size and very different needs get the same number.
  • Line item. Slower, with a cost for each part of the job. It shows what is driving the total and can be compared with contractor bids (how to write a scope of work).

A worked example

Example (illustrative arithmetic, not market data)

Assume a 1,500 square foot house. The per-square-foot rate of $30 is made up for the example, as are the line items. Every figure is a made-up round number.

Method and item Calculation Amount
Per square foot 1,500 × $30 $45,000
Kitchen given $12,000
Bathrooms given $8,000
Flooring given $6,500
Paint given $4,500
Mechanical (heating, electric, plumbing) given $5,000
Exterior given $4,000
Line items subtotal sum $40,000
Contingency, 10% 10% × $40,000 $4,000
Line-item total $40,000 + $4,000 $44,000

The two methods land $1,000 apart here, which is a 2.2% difference. On a home with an old roof or foundation work, the line-item list would show costs the rate does not.

How to use both

  1. Screen with the rate, then build the line items before offering.
  2. Compare each line with contractor bids and explain differences.
  3. Add a contingency, larger for older homes or unknown conditions.
  4. Add permits and inspection time (permits and inspections).
  5. Keep the budget with the project file and update it as costs come in (rehab budget basics).

Feed it into the deal

The rehab number is a main input to the maximum offer (the 70% rule) and to the final profit (flip profit and ROI).

Run your own numbers

Use the free maximum allowable offer calculator below to see how the rehab budget changes what you can pay.

Quick answers

What is a per-square-foot rehab estimate?

It multiplies the home's square footage by a cost per square foot chosen for the level of work. It is quick, so it is often used to screen deals before a walk-through.

What is a line-item rehab budget?

It lists each part of the job, such as kitchen, baths, flooring and paint, with its own cost. It takes longer to build but shows where the money goes and can be checked against contractor bids.

Which estimate should an investor use?

Many use the per-square-foot figure to screen a deal and a line-item budget before making an offer or signing a contractor agreement. The more work the home needs, the more a line-item budget matters.

What is a contingency?

A contingency is an amount added to the budget for costs nobody has found yet, often shown as a percentage of the estimate. The right percentage depends on the age and condition of the home.

Do the numbers in this guide apply to my project?

No. The examples are illustrative arithmetic with round numbers, including the cost per square foot, which is an assumption and not market data. Costs vary by area, scope and contractor.

Keep reading

Rehab budgeting

Add a Dump Weight Overage Line to the Rehab Budget

Learn how to price adding a dump weight overage line to the rehab budget and find the overweight-fee chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.