Insurance Deductible During a Rehab: $1,000 or $5,000?
The agent offers two quotes on the rehab policy. One has a $1,000 deductible. The other has a $5,000 deductible and a lower premium. The cheaper premium is guaranteed. The extra $4,000 you might pay on a claim is not, and that is the whole decision.
The steps
- Get quotes with two or more deductibles for the same coverage and period (vacant property insurance).
- Compute the premium saved over your hold.
- Estimate the chance of a claim during the hold and a few claim sizes.
- Compute what you would pay out of pocket at each deductible, claim size by claim size.
- Compare the premium saved with the expected extra out-of-pocket, and find the claim chance where they match.
A worked example
Example (illustrative arithmetic, not quotes)
An 8-month policy. Premium with a $1,000 deductible: $3,000 a year. With a $5,000 deductible: $2,300 a year. The premium saved over 8 months is $466.67. Suppose a 12% chance of a claim during the hold, and when there is one, 30% of the time it is a $3,000 loss and 70% of the time a $14,000 loss. Every figure is a made-up round number.
| Item | $1,000 deductible | $5,000 deductible |
|---|---|---|
| Premium for 8 months | $2,000 | $1,533.33 |
| You pay on a $3,000 claim | $1,000 | $3,000 (all of it) |
| You pay on a $14,000 claim | $1,000 | $5,000 |
| Average out-of-pocket per claim | $1,000 | 30% × $3,000 + 70% × $5,000 = $4,400 |
| Expected out-of-pocket (12% chance of a claim) | $120 | $528 |
| Premium plus expected out-of-pocket | $2,120 | $2,061 |
The high deductible saves $466.67 of premium and is expected to cost $408 more in claims, so it comes out about $59 ahead. The result flips when the chance of a claim rises above $466.67 ÷ ($4,400 − $1,000) = 13.7%. At a 20% chance the lower deductible wins by about $213 (holding costs).
The two choices are near equal in expected cost. The difference is risk: the lower deductible costs a little more every time and protects the rehab budget in a bad month. If a surprise $5,000 would hurt, pay the premium (flip cash timeline).
Making it routine
- Get at least two deductible options on every policy.
- Keep the deductible in a reserve you will not spend on materials.
- Record every claim and near-miss, and use your own frequency next time.
- Ask the agent how a claim affects your next premium.
Run your own numbers
Use the free holding cost calculator below to see the policy’s premium as part of your hold cost.