Rent-Ready Turn: Do It Yourself or Hire Out?

By DeskTech HQ · · 1 min read

Between tenants, a unit needs paint, cleaning and small repairs. You can do the work or hire it. The break-even is how many hours of your time the contractor’s price is worth.

The steps

  1. Get the contractor’s price for the turn.
  2. Total your materials if you do it.
  3. Break-even hours = (contractor price − materials) ÷ your hourly value.
  4. Add the rent lost if DIY takes longer (the cost of turnover).

A worked example

Example (illustrative arithmetic, not quotes)

The contractor charges $950. Your materials would cost $300. Your hour is worth $40. Every figure is a made-up round number.

Hours you spend DIY cost (hours × $40 + $300) Contractor − DIY
8 $620 +$330 (DIY cheaper)
16.25 $950 $0 (break-even)
24 $1,260 −$310 (contractor cheaper)

DIY is cheaper up to about sixteen hours: $650 ÷ $40. Beyond that, the contractor wins. A big turn with flooring and several rooms easily passes it.

Time to rent matters. If DIY adds three days of vacancy at $55 a day, that is $165 more on the DIY side, and it moves the break-even lower (your profit per hour).

Making it routine

  1. Time every turn you do yourself.
  2. Get a contractor quote for comparison.
  3. Compute the break-even hours.
  4. Follow safety rules for older homes.

Run your own numbers

Use the free BRRRR calculator below to see what a turn cost and the days it takes do to a rental’s cash flow.

Quick answers

How do I find the break-even hours?

Subtract materials from the contractor's price and divide by your hourly value.

What is my hour worth?

What you would earn or save by spending it elsewhere.

Does DIY take longer?

Often. Extra days vacant cost rent.

Are there safety rules?

Yes: lead-safe practices in older homes, and licensing for some work.

Do the numbers in this guide apply to my rental?

No. The prices and hourly value are made up for the example. They are not quotes.

Keep reading

BRRRR

Owner-Supplied Blinds: The Days Faster to Lease

Learn how to price owner-supplied window blinds in a rental and find how many vacancy days faster they must lease the unit to cover their cost per tenancy.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.