Vinyl Plank or Carpet in a Rental: Cost per Year
Carpet costs less to put down and is replaced often. Vinyl plank costs more and lasts longer. Which is cheaper depends on how long each lasts in your rentals.
The steps
- Get the installed price of each floor for the same area.
- Estimate how many years each lasts in a rental.
- Cost per year = installed price ÷ years of life.
- Break-even life of the pricier floor = its price ÷ the cheaper floor’s cost per year (a capex reserve by system age).
A worked example
Example (illustrative arithmetic, not quotes or product claims)
For 800 sq ft, vinyl plank costs $3.20 a square foot installed, $2,560. Carpet costs $1.90, $1,520, and lasts 5 years, $304 a year. Every figure is a made-up round number.
| Years the vinyl plank lasts | Vinyl cost per year ($2,560 ÷ years) | Carpet $304 − vinyl |
|---|---|---|
| 5 | $512 | −$208 (carpet cheaper) |
| 8.4 | $305 | ≈ $0 (break-even) |
| 12 | $213 | +$91 (vinyl cheaper) |
Vinyl has to last about eight and a half years to match carpet at five: $2,560 ÷ $304. Past that, it is cheaper each year. In a rental with hard use or pets, carpet may last three years and vinyl only seven. In a quiet one, the gap widens.
Look at what happens at turnover. Carpet often needs cleaning or replacing between tenants, which adds vacancy days. A floor that can be wiped and left saves them (appliances new or used).
Making it routine
- Record how long each floor lasted in past units.
- Get installed prices for the same area.
- Compute the break-even life.
- Pick the floor your history favors.
Run your own numbers
Use the free BRRRR calculator below to see how a yearly flooring cost changes a rental’s cash flow.