Repeat-Borrower Rate Breaks: What Loyalty Pricing Costs
A borrower who has paid off five loans on time asks for half a point off the next one. Saying yes costs real money. Saying no may cost the borrower. The question is how large a break your own numbers can support.
The steps
- Write the criteria for a repeat borrower: for example, number of loans paid off on time (repeat borrowers).
- From your records, estimate the loss rate and the hours per loan for new and for repeat borrowers.
- Convert the differences into dollars per loan.
- Compare with the cost of the break.
- Set the break at or below the savings, and write it down.
A worked example
Example (illustrative arithmetic, not benchmarks)
A $120,000 loan. A rate break of half a point costs $600. From your records, a new borrower’s loans lose 0.8% on average ($960) and a repeat borrower’s lose 0.3% ($360). A repeat loan takes 10 fewer hours to originate and service, valued at $60 an hour ($600). Every figure is a made-up round number.
| Item | Per loan |
|---|---|
| Cost of the rate break (0.5 point) | $600 |
| Lower expected loss ($960 − $360) | $600 |
| Fewer hours (10 × $60) | $600 |
| Savings | $1,200 |
| Net benefit of the break | +$600 |
The savings are twice the break, so on these numbers you could go as far as one full point ($1,200) before the break stopped paying for itself. Over 12 repeat loans a year, the half-point break is worth about $7,200 net (loan-level profit).
The risk is in the inputs. Loss rates from a small number of loans are unstable, and a repeat borrower can still fail, especially after a string of successes leads to bigger projects. Tie the break to criteria and revisit it as your data grows (risk-tier pricing).
A break should be a written policy that applies equally to everyone who meets the criteria, not a favor negotiated one borrower at a time (fee schedule).
Making it routine
- Track hours and losses by borrower type.
- Write the criteria and the break in your policy manual.
- Apply it the same way to every borrower who qualifies.
- Review the numbers each year, and ask an attorney to check the policy.
Run your own numbers
Use the free fix-and-flip loan sizer below to see what a half-point break costs on your own loan sizes.