Loan Exceptions Log: What Breaking Your Own Rules Costs
Most lenders have a written limit and a loan that broke it. The first exception feels like a one-off. By the tenth, it is a second underwriting policy that nobody wrote down, and nobody priced.
The steps
- Write down your limits (LTV and LTC limits).
- For every approved loan that breaks one, log the rule, the reason, the approver and any extra fee.
- At payoff, record the result: paid as agreed, late, loss.
- Compare the loss rate of exception loans with the rest.
- Compare the extra loss with the extra fee you collected.
A worked example
Example (illustrative arithmetic, not market data)
A lender has 40 loans. Ten broke a limit and averaged $140,000, so $1,400,000. Thirty did not and averaged $120,000, so $3,600,000. The exception loans carried one extra point (1%) as a premium. Losses at payoff: $15,000 on the exception loans and $4,800 on the others. Every figure is a made-up round number.
| Item | Exception loans | Other loans |
|---|---|---|
| Volume | $1,400,000 | $3,600,000 |
| Losses | $15,000 | $4,800 |
| Loss rate | 1.07% | 0.13% |
| Extra point collected | $14,000 | none |
The exception loans lost $15,000 against the $14,000 premium, so they were $1,000 short on the premium alone. A fairer comparison asks what the same volume would have lost at the normal rate: $1,400,000 × 0.133% = $1,867. The extra loss from the exceptions is $15,000 − $1,867 = $13,133, and the premium covered it by only $867 ($14,000 − $13,133). That is before the time spent on the exceptions (minimum loan size).
With ten loans, a single bad one can drive this, so the result is a question to investigate, not a conclusion. If the premium is meant to cover exceptions, the log tells you whether one point is enough (effective yield).
Making it routine
- Keep the log in the same place as your loan records.
- Require a written reason and a named approver for every exception.
- Review the log with your loss results once a quarter (loss reserve planning).
- Either price exceptions or change the policy, so the written rule matches what you do.
Run your own numbers
Use the free fix-and-flip loan sizer below to test a loan against your own limits before you decide whether it is an exception.