Replace Loose Doorknobs at Turnover: The Callout Odds
A knob wobbles from the first day. A month later it spins without turning the latch, and a tenant is stuck in a bedroom. A new knob costs about twelve dollars and takes eight minutes. The question is how likely a first-month callout is for the swap to pay.
The steps
- Price the swap: knob + minutes × the value of your time.
- Price a callout: a handyman visit.
- Break-even chance = swap cost ÷ callout cost.
- Check the latches too (door strike plates and latches at turnover).
A worked example
Example (illustrative arithmetic, not predictions)
The knob costs $12 plus 8 minutes at $60 an hour ($8): $20. A callout costs $80. Every figure is a made-up round number.
| Chance of a first-month callout | Expected cost avoided (chance × $80) | Avoided − $20 |
|---|---|---|
| 12.5% | $10 | −$10 |
| 25% | $20 | $0 (break-even) |
| 40% | $32 | +$12 |
| 60% | $48 | +$28 |
The swap pays at a 25% chance of a first-month callout: $20 ÷ $80. For a knob that already wobbles, that is plausible.
Test each knob for play, replace the ones that wobble, and check that the latch catches and the door opens from both sides. Keep emergency access in mind for bathrooms and bedrooms.
Making it routine
- Test each knob for play.
- Replace the ones that wobble.
- Check the latch catches.
- Keep emergency access in mind.
Run your own numbers
Use the free BRRRR calculator below to see how avoided callouts add up across a hold.