Run the Irrigation System and Walk Every Zone at Turnover

By DeskTech HQ · · 1 min read

A sprinkler head is snapped off by a mower. Every morning it fires a fountain at the driveway and the water bill climbs. A ten-minute walk of every zone at turnover would have caught it. The question is how likely a broken head or flooded bed is for the walk to pay.

The steps

  1. Price the walk: minutes × the value of your time.
  2. Price a broken head or flood: water, damage and a repair visit.
  3. Break-even chance = walk cost ÷ problem cost.
  4. Plan seasonal care (seasonal holdback for landscaping and exterior paint).

A worked example

Example (illustrative arithmetic, not predictions)

The walk takes 10 minutes at $60 an hour: $10. A broken head or flooded bed costs $200 to fix. Every figure is a made-up round number.

Chance of a broken head or flooded bed Expected cost avoided (chance × $200) Avoided − $10
2.5% $5 −$5
5% $10 $0 (break-even)
10% $20 +$10
20% $40 +$30

The walk pays at a 5% chance of a broken head or flooded bed: $10 ÷ $200. After a season of vacancy and mowing, it is plausible.

Run each zone in turn, watch for heads that are broken, clogged or misaimed, and note leaks. Shut the system off and drain it before freezing weather, and have a professional fix valves.

Making it routine

  1. Run each zone in turn.
  2. Watch for broken or misaimed heads.
  3. Note leaks.
  4. Drain it before freezing weather.

Run your own numbers

Use the free closing net sheet below to see how small upkeep costs add up against what you keep at sale.

Quick answers

What does the walk show?

Broken heads, clogged nozzles, leaks and zones that never turn on.

How do I price it?

The minutes times the value of your time.

What does a broken head or flood cost?

Wasted water, a dead lawn or a flooded bed and a repair visit.

What is the break-even chance?

The walk's cost divided by that cost.

Do the numbers in this guide apply to my property?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.