Slow-Season Rehab: Is the Extra Month of Interest Worth It?
A rehab started in the winter often runs long. For the lender, a longer loan means more interest, if it is paid, and more time for something to go wrong. The question is how much added risk cancels the extra interest.
The steps
- Take the extra interest from one more month.
- Estimate the loss if the loan defaults.
- Break-even added chance = extra interest ÷ loss.
- Compare with how much a slow season raises the chance of default (loan extensions).
A worked example
Example (illustrative arithmetic, not predictions)
A $150,000 loan at 11% earns $1,375 a month. A default would lose $40,000. Every figure is a made-up round number.
| Added chance of default from the slower season | Expected added loss (chance × $40,000) | Extra interest − added loss |
|---|---|---|
| 1% | $400 | +$975 |
| 3.4% | $1,375 | $0 (break-even) |
| 5% | $2,000 | −$625 |
| 8% | $3,200 | −$1,825 |
The extra month is worth it only if the slow season adds less than about 3.4 points of default chance: $1,375 ÷ $40,000. A borrower who is well capitalized may add one point. One who is stretched may add eight.
That favors pricing the slow season in: a longer term with an extension fee, a larger contingency, and a hard look at the borrower’s cash (sizing the rehab contingency).
Making it routine
- Ask each borrower about their winter plan.
- Build the likely delay into the term.
- Compute the break-even added chance.
- Price in an extension fee where risk is higher.