Rehab Contingency: Sizing the Buffer by Risk

By DeskTech HQ · · 1 min read

A rehab budget with no buffer is a budget that will be wrong. The usual fix is a flat 10%. A better fix is to ask which parts of the job are most likely to surprise you, and size the buffer to match.

The steps

  1. Split the rehab budget into groups of work.
  2. Give each group a risk level and a percentage.
  3. Contingency = group cost × percentage, added up across groups.
  4. Subtract the contingency from planned profit and see if the deal still works (break-even price).

A worked example

Example (illustrative arithmetic, not a standard)

A $70,000 rehab budget (rehab budget). Every figure is a made-up round number.

Work group Budget Risk Percentage Contingency
Cosmetic (paint, floors) $18,000 Low 5% $900
Kitchen and baths $24,000 Medium 10% $2,400
Mechanical (HVAC, electrical, plumbing) $16,000 Medium-high 15% $2,400
Structure and unknowns $12,000 High 25% $3,000
Total $70,000 12.43% $8,700

A flat 10% would set aside $7,000, $1,700 less. The risk-based buffer puts the extra where the surprises are likelier. The budget with contingency is $78,700. If the plan showed $30,000 of profit before any contingency, it shows $21,300 after it. If the deal only works at $30,000, the deal is thinner than it looked.

Using the contingency

  1. Spend it only on real surprises, and log each one (overruns).
  2. Price changes through written change orders (change orders).
  3. Keep a separate cash reserve outside the budget (cash reserve).
  4. After the project, compare what was used with what was set aside and adjust the percentages (year-end review).

Run your own numbers

Use the free holding cost calculator below to see how a longer project adds to the cost beside the rehab budget.

Quick answers

What is a rehab contingency?

It is money set aside inside the rehab budget for costs that are likely but not yet known, such as hidden damage or price changes. It is planned in advance, separate from a cash reserve.

Why not use one flat percentage?

A flat percentage treats a paint job and a foundation repair the same. Sizing by risk puts more buffer where surprises are more likely and less where the work is simple.

How do I pick the percentages?

Start with your own past projects: compare planned and actual cost for each type of work. If you have no history, choose cautious numbers and adjust after each project.

How is contingency different from a cash reserve?

Contingency is part of the rehab budget for expected surprises. A reserve is extra cash outside the budget for events such as a delayed sale. Both are worth planning for.

Do the numbers in this guide apply to my project?

No. The line items, risk levels and percentages are made up for the example. They are not market data, a standard or a prediction of results.

Keep reading

Flip project management

Material Waste Factor: How Much Extra to Order

Learn how to choose a waste allowance for flooring, tile and trim by comparing the cost of extra material with the cost of running short.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.