Spot-Check One Line of Each Bid Against a Supplier Quote
The tile line on a bid is $2,400, and the tile at the supplier is $1,500. Nobody checked. Pricing one line on each bid takes four minutes. The question is how likely a padded line is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price a padded line: paying well above the going price for materials on that line.
- Break-even chance = check cost ÷ padding cost.
- Pick the budget method too (rehab estimate per square foot vs line item).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 4 minutes at $60 an hour: $4. A padded line costs $400 extra. Every figure is a made-up round number.
| Chance of a padded line | Expected cost avoided (chance × $400) | Avoided − $4 |
|---|---|---|
| 0.5% | $2 | −$2 |
| 1% | $4 | $0 (break-even) |
| 3% | $12 | +$8 |
| 5% | $20 | +$16 |
The check pays at a 1% chance of a padded line: $4 ÷ $400. Over several bids, it is easily exceeded.
Pick the biggest material line on each bid, price it with a supplier and ask the bidder about any large gap. A gap is a question, not an accusation.
Making it routine
- Pick the biggest material line on each bid.
- Price it with a supplier.
- Ask the bidder about any large gap.
- Remember that labor and handling add to the price.
Run your own numbers
Use the free MAO calculator below to see how a rehab budget changes your maximum offer.