Spot-Check One Line of Each Bid Against a Supplier Quote

By DeskTech HQ · · 1 min read

The tile line on a bid is $2,400, and the tile at the supplier is $1,500. Nobody checked. Pricing one line on each bid takes four minutes. The question is how likely a padded line is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a padded line: paying well above the going price for materials on that line.
  3. Break-even chance = check cost ÷ padding cost.
  4. Pick the budget method too (rehab estimate per square foot vs line item).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 4 minutes at $60 an hour: $4. A padded line costs $400 extra. Every figure is a made-up round number.

Chance of a padded line Expected cost avoided (chance × $400) Avoided − $4
0.5% $2 −$2
1% $4 $0 (break-even)
3% $12 +$8
5% $20 +$16

The check pays at a 1% chance of a padded line: $4 ÷ $400. Over several bids, it is easily exceeded.

Pick the biggest material line on each bid, price it with a supplier and ask the bidder about any large gap. A gap is a question, not an accusation.

Making it routine

  1. Pick the biggest material line on each bid.
  2. Price it with a supplier.
  3. Ask the bidder about any large gap.
  4. Remember that labor and handling add to the price.

Run your own numbers

Use the free MAO calculator below to see how a rehab budget changes your maximum offer.

Quick answers

What do you do?

Pick one material line on each bid and price it with a supplier.

How do I price it?

The minutes to call or look up the price times the value of your time.

What does a padded line cost?

Paying well above the going price for materials on that line.

What is the break-even chance?

The check's cost divided by that cost.

Do the numbers in this guide apply to my rehab?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Dump Weight Overage Line to the Rehab Budget

Learn how to price adding a dump weight overage line to the rehab budget and find the overweight-fee chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.