Text the Draw Inspector the Access Details the Day Before
The inspector drives forty minutes to a locked door. The contractor is at another job. A text the day before with the access details takes three minutes. The question is how likely a locked-door visit is for the text to pay.
The steps
- Price the text: minutes × the value of your time.
- Price a locked-door visit: a wasted trip and a repeat visit.
- Break-even chance = text cost ÷ wasted-trip cost.
- Use the same inspector (same inspector for every draw on a job).
A worked example
Example (illustrative arithmetic, not predictions)
The text takes 3 minutes at $60 an hour: $3. A locked-door visit costs $75. Every figure is a made-up round number.
| Chance of a locked-door visit | Expected cost avoided (chance × $75) | Avoided − $3 |
|---|---|---|
| 2% | $1.50 | −$1.50 |
| 4% | $3 | $0 (break-even) |
| 8% | $6 | +$3 |
| 12% | $9 | +$6 |
The text pays at a 4% chance of a locked-door visit: $3 ÷ $75. Across many draws, it is plausible.
Send the address, the time, how to get in and a number to call on arrival the day before, ask for a thumbs-up, and change any code afterward.
Making it routine
- Send address, time and access the day before.
- Include a number to call on arrival.
- Ask for a thumbs-up.
- Change any code afterward.