Tile Setter: Per Square Foot or Day Rate? The Speed

By DeskTech HQ · · 2 min read

A tile setter can charge by the square foot or by the day. The two prices look comparable, but they reward different things. A per-square-foot price pays for the result. A day rate pays for time. Which costs you less depends on how fast the setter works.

The steps

  1. Get the per-square-foot price and the day rate, for the same scope.
  2. Crossing speed (sq ft per day) = day rate ÷ per-square-foot price.
  3. Compare with how fast this setter really lays tile (comparing contractor bids).

A worked example

Example (illustrative arithmetic, not quotes)

The setter charges $12 a square foot or $480 a day. The crossing speed is 40 square feet a day: $480 ÷ $12. Every figure is a made-up round number.

Setter’s real speed Day-rate cost per square foot Day rate − $12 per sq ft, on 200 sq ft
30 sq ft a day $16.00 +$800 (per sq ft cheaper)
40 sq ft a day $12.00 $0 (even)
50 sq ft a day $9.60 −$480 (day rate cheaper)

If the setter lays 30 square feet a day, the day rate costs $16 a square foot, so the per-square-foot price is cheaper. If the setter lays 50, the day rate is cheaper.

Speed depends on the tile, the layout and the prep. Small tile, diagonal patterns and tricky cuts slow everything down. Bid prices for hard layouts will reflect that, and the right check is asking what the price includes (hourly or flat on a punch list).

Making it routine

  1. Ask for both prices on the same written scope.
  2. Estimate the real speed for your layout.
  3. Compute the crossing speed.
  4. Choose the method that fits the setter’s pace.

Run your own numbers

Use the free holding cost calculator below to see what each extra day of tile work costs on a project.

Quick answers

Where do the two methods cross?

At the speed equal to the day rate divided by the per-square-foot price.

Which favors the owner when the setter is slow?

The per-square-foot price, since a slow setter costs you more days.

Which favors the owner when the setter is fast?

The day rate.

Does the job have prep time?

Yes. Ask what the price includes: prep, waterproofing, grout and cleanup.

Do the numbers in this guide apply to my project?

No. The rates and speeds are made up for the example. They are not quotes.

Keep reading

Flip project management

Builder's Risk: Per Project or Annual Policy?

Learn how to find the number of rehab projects a year at which an annual builder's risk policy costs less than buying one policy per project.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.