Title Updates at Each Draw: Is $75 Worth It?
A construction loan funds in pieces over months. Between the first draw and the last, someone can record a lien on the property: an unpaid contractor, a supplier, a judgment against the borrower. A title update before each draw is a way to see it before more money goes out. The question is how often that has to matter.
The steps
- Get the fee for a title update from your title company.
- Estimate the loss if a new lien goes unnoticed and affects your position (title commitment review).
- Divide the fee by the loss. That is the break-even chance of a new lien in a draw period.
- Compare it with how often liens appear on your construction loans.
- Decide which draws need an update and which do not.
A worked example
Example (illustrative arithmetic, not quotes or statistics)
A title update costs $75. A new lien that affects the lender’s position could cost about $15,000. A loan has six draws. Every figure is a made-up round number.
| Chance of a new lien in a draw period | Expected loss (× $15,000) | Fee | Net per draw |
|---|---|---|---|
| 0.2% | $30 | $75 | −$45 |
| 0.5% | $75 | $75 | $0 |
| 2% | $300 | $75 | +$225 |
| Break-even | $75 ÷ $15,000 = 0.5% |
If a new lien appears in one draw period in two hundred, the update pays. For a rehab with many trades and suppliers, where claims by unpaid subcontractors are common, the chance is above that. For a small project with one contractor and a clean history, it is lower. Updates at each of six draws cost $450 a loan, which is small next to a priority fight over $15,000.
You can also be selective. Update before the first draw and the last, and before any large draw, instead of every one. And pair the update with lien waivers from the people being paid, so the claims are cleared as the money goes out (lien waivers on draws). The two tools cover different risks: waivers clear known claims, and the update finds unknown ones.
Making it routine
- Set a rule for which draws get an update.
- Ask the title company how date-downs work for your policy.
- Pair updates with lien waivers.
- Record any lien found and when.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how many draws a holdback creates, and so how many updates.