Pay the Contractor Directly? Handling Cost vs Diversion
A draw goes to the borrower, and the borrower is supposed to pay the contractor. Most of the time that is what happens. When it does not, the lender has paid for work that was not paid for, and the lien rights of the contractor and suppliers can remain. Paying the contractor directly removes a step, at a cost.
The steps
- Price the extra handling per draw: verifying the payee, collecting an invoice, one more payment.
- Multiply by the draws on a typical loan.
- Estimate the loss if one draw is diverted.
- Divide the handling cost by the loss. That is the chance of a diversion per loan at which direct payment breaks even.
- Compare it with your experience and with the borrower and contractor involved (draw request review).
A worked example
Example (illustrative arithmetic, not benchmarks)
Direct payment adds $25 of handling per draw, on a loan with 6 draws: $150. A diverted draw would cost about $12,000. Every figure is a made-up round number.
| Chance of a diversion on a loan | Expected loss (× $12,000) | Handling cost | Net |
|---|---|---|---|
| 0.5% | $60 | $150 | −$90 |
| 1.25% | $150 | $150 | $0 |
| 3% | $360 | $150 | +$210 |
| Break-even | $150 ÷ $12,000 = 1.25% |
With a borrower you know and a contractor you have seen before, the chance is probably below 1.25%, and the handling is not worth it. With a new borrower, an unfamiliar contractor, or a history of liens on earlier loans, direct payment is cheap insurance. A middle path is direct payment for the largest draws, or the first draw to a new contractor (vetting the borrower’s contractor).
Direct payment has side effects. Pair it with lien waivers from the payee, so the money’s recipient gives up lien rights for that amount. And be clear that the lender is paying on the borrower’s written instruction, not taking on the borrower’s duties under the construction contract (lien waivers on draws).
Making it routine
- Put direct payment terms in the loan documents.
- Get the borrower’s written direction for each payee.
- Verify payee details by a call to a number you look up yourself.
- Record any diversion you find, and the loan it came from.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how the holdback is split across the draws.