Weatherstrip Exterior Doors at Turnover: Months to Pay
A door lets a draft in all winter. Weatherstripping costs a few dollars of material and twenty minutes of work. When the owner pays the heat, the savings are the owner’s. The question is how many months of saving it takes to pay for the job.
The steps
- Price the job: materials + minutes × the value of your time.
- Estimate the monthly saving while the owner pays utilities.
- Payback months = job cost ÷ monthly saving.
- Check the latch first (door strike plates and latches at turnover).
A worked example
Example (illustrative arithmetic, not benchmarks)
The job costs $15 of materials plus 20 minutes at $60 an hour ($20): $35. It saves $7 a month in owner-paid heating and cooling. Every figure is a made-up round number.
| Months of owner-paid utilities | Saving (months × $7) | Saving − $35 |
|---|---|---|
| 2 | $14 | −$21 |
| 5 | $35 | $0 (break-even) |
| 8 | $56 | +$21 |
| 12 | $84 | +$49 |
The job pays back in 5 months: $35 ÷ $7. If the tenant pays utilities, the benefit is a happier tenant rather than a saving for you.
Measure the gap, buy the right profile for the door, and check that the door closes and latches before you start. Test with a sheet of paper in the closed door; it should resist being pulled out.
Making it routine
- Fix the latch first.
- Buy the right profile for the gap.
- Fit and test with a sheet of paper.
- Repeat on every exterior door.
Run your own numbers
Use the free BRRRR calculator below to see how a small monthly saving adds up across a hold.