Wipe the Fridge and Freezer With Baking Soda Before Showings

By DeskTech HQ · · 1 min read

A prospect opens the refrigerator to check its size and gets a blast of stale air. The rest of the unit is spotless. A wipe with baking soda and a day with the doors propped takes eight minutes. The question is how likely a prospect is to pass over the odor for the wipe to pay.

The steps

  1. Price the wipe: baking soda + minutes × the value of your time.
  2. Price a passed prospect: extra days of vacancy.
  3. Break-even chance = wipe cost ÷ cost of the lost days.
  4. Clean the coils too (clean the refrigerator coils and drip pan at turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The wipe costs $2 of baking soda plus 8 minutes at $60 an hour ($8): $10. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.

Chance a prospect passes over the odor Expected cost avoided (chance × $100) Avoided − $10
5% $5 −$5
10% $10 $0 (break-even)
20% $20 +$10
30% $30 +$20

The wipe pays at a 10% chance that a prospect passes over the odor: $10 ÷ $100. After a long vacancy, it is plausible.

Unplug the unit, wash the shelves and seals with warm water and baking soda, dry them and prop the doors for a day. Put an open box of baking soda inside, and plug it back in.

Making it routine

  1. Unplug the unit.
  2. Wash shelves and seals with warm water and baking soda.
  3. Dry them and prop the doors for a day.
  4. Plug it back in.

Run your own numbers

Use the free closing net sheet below to see what each vacant day costs on your own rental.

Quick answers

Why wipe the fridge?

A closed fridge in a vacant unit can smell stale, and prospects open it.

How do I price it?

The baking soda plus the minutes to wipe and air it.

What does a passed prospect cost?

Extra days of vacancy.

What is the break-even chance?

The wipe's cost divided by the cost of the lost days.

Do the numbers in this guide apply to my rental?

No. The costs, rents and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.