Wipe the Window Tracks and Sills Before Showings

By DeskTech HQ · · 1 min read

A prospect slides a window open and finds a gray trench of dust and dead flies in the track. The glass is spotless. Wiping the tracks and sills takes eight minutes. The question is how likely a prospect is to pass over a dirty corner for the wipe to pay.

The steps

  1. Price the wipe: minutes × the value of your time.
  2. Price a passed prospect: extra days of vacancy.
  3. Break-even chance = wipe cost ÷ cost of the lost days.
  4. Do the other touch points too (wipe down light switches and door handles).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The wipe takes 8 minutes at $60 an hour: $8. A passed prospect costs 2 extra vacant days at $50 a day: $100. Every figure is a made-up round number.

Chance a prospect passes over a dirty corner Expected cost avoided (chance × $100) Avoided − $8
4% $4 −$4
8% $8 $0 (break-even)
16% $16 +$8
24% $24 +$16

The wipe pays at an 8% chance that a prospect passes over a dirty corner: $8 ÷ $100. In a unit that has sat empty, it is plausible.

Vacuum the tracks first, wipe with a damp cloth and mild cleaner, dry them and run each window to check it slides. Keep cleaner off the finish and be careful near open upper-floor windows.

Making it routine

  1. Vacuum the tracks first.
  2. Wipe with a damp cloth and mild cleaner.
  3. Dry and run each window.
  4. Take care near open upper-floor windows.

Run your own numbers

Use the free closing net sheet below to see what each vacant day costs on your own rental.

Quick answers

Why wipe tracks and sills?

They collect dust, dead bugs and grime that a quick clean of the glass skips.

How do I price it?

The minutes times the value of your time.

What does a passed prospect cost?

Extra days of vacancy.

What is the break-even chance?

The wipe's cost divided by the cost of the lost days.

Do the numbers in this guide apply to my rental?

No. The costs, rents and odds are made up for the example. They are not quotes or predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.