Temporary Fence on a Project: The Theft Odds That Pay
A rehab site holds copper, fixtures, tools and materials. A temporary fence costs a monthly rental fee. The question is how likely a loss has to be to justify it.
The steps
- Total the fence cost: rental, delivery and removal.
- Estimate the loss a theft would cause, net of insurance.
- Break-even chance = fence cost ÷ loss.
- Compare with the crime and traffic around the site (insuring a vacant flip).
A worked example
Example (illustrative arithmetic, not predictions)
The fence costs $180 a month for 4 months, $720. A theft would cost $6,000 after insurance. Every figure is a made-up round number.
| Chance of a theft over the project | Expected loss avoided (chance × $6,000) | Avoided − $720 |
|---|---|---|
| 5% | $300 | −$420 |
| 12% | $720 | $0 (break-even) |
| 20% | $1,200 | +$480 |
The fence needs a 12% chance of a theft over the project to pay: $720 ÷ $6,000. A site in an active area, with high-value items on it, is above that. A quiet street with a short job is not.
A fence works best alongside the cheaper steps: no materials left in view, lights on a timer, and regular visits (visiting a vacant flip).
Making it routine
- Look at the area’s history of theft.
- Check the policy for materials and tools.
- Compute the break-even chance.
- Add a fence for high-value stages only.