Write the Furnace Filter Size on the Unit at Turnover

By DeskTech HQ · · 1 min read

Someone buys the wrong size filter for a rental furnace and the old one stays in for a year. Writing the size on the unit at turnover takes two minutes. The question is how likely a wrong-filter trip or a skipped change is for the note to pay.

The steps

  1. Price the note: minutes × the value of your time.
  2. Price a wrong filter: a wasted trip or a gap in changing it.
  3. Break-even chance = note cost ÷ wrong-filter cost.
  4. Leave a filter too (leave a furnace filter at move-in).

A worked example

Example (illustrative arithmetic, not predictions)

The note takes 2 minutes at $60 an hour: $2. A wrong filter costs $40 in a trip and a gap. Every figure is a made-up round number.

Chance of a wrong filter or a skipped change Expected cost avoided (chance × $40) Avoided − $2
2.5% $1 −$1
5% $2 $0 (break-even)
10% $4 +$2
15% $6 +$4

The note pays at a 5% chance of a wrong filter: $2 ÷ $40. Over several turnovers and tenants, it is plausible.

Measure the filter, write the size on the unit in marker and add it to the unit sheet.

Making it routine

  1. Measure the filter.
  2. Write the size on the unit in marker.
  3. Add it to the unit sheet.
  4. Check the size when the equipment changes.

Run your own numbers

Use the free BRRRR calculator below to see how small maintenance costs affect your returns on a hold.

Quick answers

What do you write?

The filter size, in marker, on the furnace or the return grille.

How do I price it?

The minutes to measure and write it times the value of your time.

What does a wrong filter cost?

A wasted trip to buy the wrong size, or a gap in changing it.

What is the break-even chance?

The note's cost divided by that cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.