Lending With Borrowed Money: Spread, Leverage and Loss
Some lenders fund loans with a credit line or other borrowed money so they can make more loans with the same cash. The arithmetic is simple, and it works in both directions.
The steps
- Income = interest + points on the loan.
- Cost of funds = interest and fees on the borrowed part.
- Net income = income − cost of funds.
- Return on own cash = net income ÷ own cash, annualized for the months held (effective yield).
- Repeat with a loss on the loan.
A worked example
Example (illustrative arithmetic, not a recommendation)
A $100,000 loan at 11% with 2 points, repaid after 6 months. Case 1 uses the lender’s own cash. Case 2 funds $70,000 with borrowed money at 8% plus a 1% fee, so own cash is $30,000. Income is $5,500 of interest plus $2,000 of points, $7,500. Every figure is a made-up round number.
| Item | Own cash only | 70% borrowed |
|---|---|---|
| Income | $7,500 | $7,500 |
| Cost of funds | $0 | $3,500 ($2,800 interest + $700 fee) |
| Net income | $7,500 | $4,000 |
| Own cash used | $100,000 | $30,000 |
| Return, 6 months | 7.50% | 13.33% |
| Annualized | 15.0% | 26.7% |
| Net after a $5,000 principal loss | $2,500 | −$1,000 |
| Annualized after the loss | 5.0% | −6.7% |
Borrowing lifts the return from 15.0% to 26.7% when the loan is repaid in full, but a 5% loss on principal turns the borrowed case negative while the own-cash case still earns 5.0%. The borrowed money has to be repaid either way. A longer loan also adds to the cost of funds with no extra income unless interest keeps accruing and is paid.
Before borrowing to lend
- Test the return at several loss levels, not only at the planned case (downside test).
- Check the repayment dates of the borrowing against the loan maturities (cash planning).
- Do not let one loan or borrower carry the borrowing (concentration).
- Have the borrowing terms and your state’s rules reviewed by a professional.
Run your own numbers
Use the free fix-and-flip loan sizer below to size the loan before you decide how it will be funded.