Check Every Faucet for a Hot-Cold Reversal at Turnover

By DeskTech HQ · · 1 min read

After a bathroom rehab the left handle runs hot and the right runs cold, backwards from every other faucet in the house. A tenant gets a surprise scald and calls. Running each faucet at turnover takes three minutes. The question is how likely a reversal is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a reversal call: a plumber visit to correct the lines.
  3. Break-even chance = check cost ÷ call cost.
  4. Test the temperature too (test the hot water temperature at turnover).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 3 minutes at $60 an hour: $3. A reversal call costs $120. Every figure is a made-up round number.

Chance of a hot-cold reversal Expected cost avoided (chance × $120) Avoided − $3
1.25% $1.50 −$1.50
2.5% $3 $0 (break-even)
5% $6 +$3
10% $12 +$9

The check pays at a 2.5% chance of a reversal: $3 ÷ $120. After plumbing work, it is plausible.

Run each faucet and tub on its hot side briefly and check that the left or marked hot handle gives the warm water. Do it with care and not at the hottest setting, and have a plumber correct any reversal.

Making it routine

  1. Run each faucet on its hot side briefly.
  2. Check that the marked hot handle gives warm water.
  3. Test with care and not at the hottest setting.
  4. Have a plumber correct any reversal.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What is a reversal?

Hot water coming from the cold side of a faucet, or the reverse.

How do I price the check?

The minutes times the value of your time.

What does a reversal call cost?

A plumber visit to swap the lines or the fixture.

What is the break-even chance?

The check's cost divided by the call cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.