Run Water Under Every Sink and Check the Traps: The Odds

By DeskTech HQ · · 1 min read

A trap joint under the bathroom sink weeps only when the basin is full. Nobody looks until the cabinet floor is soft. Running the water and checking each joint takes eight minutes across a house. The question is how likely a hidden drip is for the check to pay.

The steps

  1. Price the check: minutes × the value of your time.
  2. Price a hidden drip: cabinet repair and a visit.
  3. Break-even chance = check cost ÷ repair cost.
  4. Add a sensor (put a water leak sensor under the kitchen sink).

A worked example

Example (illustrative arithmetic, not predictions)

The check takes 8 minutes at $60 an hour: $8. A hidden drip costs $100 to repair. Every figure is a made-up round number.

Chance of a hidden drip Expected cost avoided (chance × $100) Avoided − $8
4% $4 −$4
8% $8 $0 (break-even)
16% $16 +$8
24% $24 +$16

The check pays at an 8% chance of a hidden drip: $8 ÷ $100. In an older house with several sinks, it is plausible.

Fill each basin, pull the plug, run a dry paper towel around every joint and watch for moisture. Hand-tighten slip joints and do not over-tighten plastic. Call a plumber for anything at a supply line.

Making it routine

  1. Fill each basin and pull the plug.
  2. Run a dry paper towel around each joint.
  3. Hand-tighten slip joints.
  4. Call a plumber for supply line leaks.

Run your own numbers

Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.

Quick answers

What is a p-trap?

The curved pipe under a sink that holds water to block sewer gas.

How do I price the check?

The minutes to run water and look times the value of your time.

What does a hidden drip cost?

A rotted cabinet floor and a repair visit.

What is the break-even chance?

The check's cost divided by the repair cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

Rehab budgeting

Add a Final Cleaning Line to the Rehab Budget

Learn how to price adding a final cleaning line to the rehab budget and find the forgotten-clean chance at which three minutes of work pays for itself.

· 1 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.