Test Hot Water Temperature at Turnover: The Odds
A water heater set too high can scald a child. One set too low gives lukewarm showers and a call in week one. A thermometer test at turnover takes three minutes. The question is how likely a problem is for the test to pay.
The steps
- Price the test: minutes × the value of your time.
- Estimate the cost of a complaint or an incident.
- Break-even chance = cost ÷ cost of an incident.
- Compare with the age of the heater and past calls (water heater at year 10).
A worked example
Example (illustrative arithmetic, not predictions)
The test takes 3 minutes at $60 an hour: $3. A complaint or incident would cost $300. Every figure is a made-up round number.
| Chance the setting is wrong | Expected cost avoided (chance × $300) | Avoided − $3 |
|---|---|---|
| 0.5% | $1.50 | −$1.50 |
| 1% | $3.00 | $0 (break-even) |
| 3% | $9.00 | +$6.00 |
| 6% | $18.00 | +$15.00 |
The test pays at a 1% chance that the setting is wrong: $3 ÷ $300. Tenants and past owners change dial settings, so the chance is likely higher.
Run the hot tap until it stops rising and read a kitchen thermometer. Set the heater to the level the local code and the maker advise, and log the reading. A water heater that cannot hold temperature is an early sign of failure.
Making it routine
- Test the hot tap at every turnover.
- Set the heater to the advised level.
- Log the reading and the date.
- Flag heaters that cannot hold temperature.
Run your own numbers
Use the free BRRRR calculator below to see how a heater replacement changes a rental’s yearly cash flow.