Check the Bathroom Sink Stopper Moves Freely at Turnover
A tenant fills the basin and the stopper will not lift. Or it will not seal. The first call of the lease is about the sink. Working each stopper at turnover takes four minutes across a house. The question is how likely a stuck-stopper call is for the check to pay.
The steps
- Price the check: minutes × the value of your time.
- Price a stuck-stopper call: a visit to free or replace it.
- Break-even chance = check cost ÷ call cost.
- Pair it with the plunger (leave a plunger and toilet brush at move-in).
A worked example
Example (illustrative arithmetic, not predictions)
The check takes 4 minutes at $60 an hour: $4. A stuck-stopper call costs $80. Every figure is a made-up round number.
| Chance of a stuck-stopper call | Expected cost avoided (chance × $80) | Avoided − $4 |
|---|---|---|
| 2.5% | $2 | −$2 |
| 5% | $4 | $0 (break-even) |
| 10% | $8 | +$4 |
| 20% | $16 | +$12 |
The check pays at a 5% chance of a stuck-stopper call: $4 ÷ $80. With several old sinks, it is plausible.
Lift and press each stopper, fill the basin and watch it drain, and check the linkage under the sink. Free what you can gently and replace what is worn. Call a plumber for clogs that will not clear.
Making it routine
- Lift and press each stopper.
- Fill the basin and watch it drain.
- Check the linkage under the sink.
- Call a plumber for clogs that will not clear.
Run your own numbers
Use the free closing net sheet below to see how small turnover costs add up against what you keep at sale.