Condo Collateral: The LTV Haircut for a Slower Sale
A condo can be harder to sell than a house. The buyer pool is smaller, the association may restrict financing or rentals, and the building’s finances matter. A lender who takes a condo as collateral may need a lower loan-to-value to cover the extra time. This guide shows how to size that cushion.
The steps
- Estimate the extra months a condo takes to sell compared with a house.
- Total the monthly cost of carrying it: interest forgone, association dues, taxes and insurance.
- Haircut = extra months × monthly carry ÷ value.
- Subtract the haircut from your normal loan-to-value (LTV, LTC and ARV).
A worked example
Example (illustrative arithmetic, not underwriting standards)
A condo is worth $250,000. Carrying it costs $1,800 a month. Every figure is a made-up round number.
| Extra months to sell | Added carry (months × $1,800) | Haircut (share of $250,000) |
|---|---|---|
| 1 | $1,800 | 0.72 points |
| 3 | $5,400 | 2.16 points |
| 6 | $10,800 | 4.32 points |
If a condo takes three months longer to sell, the added carry is $5,400, about 2.2 points of value. A lender who lends at 70% on a house may choose 68% on a condo for that reason alone.
The real work is in the building. A building with deferred maintenance, a special assessment on the way, litigation or a high share of rentals can be far harder to sell than the average. Read the association’s budget and documents before you set the loan terms, and treat every condo the same way (concentration risk).
Making it routine
- Collect the association’s budget, reserve study and any litigation notices.
- Estimate the extra months to sell from local data.
- Compute the haircut.
- Apply the same standard to every condo loan.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how a lower loan-to-value changes a loan.