The Final Draw: What to Hold Back Until the Work Is Done

By DeskTech HQ · · 2 min read

The last draw is the easiest to approve. The house looks done, the photos are clean, and the borrower is already talking about a buyer. It is also the draw where a gap between “looks done” and “is done” is most expensive.

The steps

  1. Write the retainage percentage and the final-release conditions into the loan and draw documents (draw schedule).
  2. At the final request, inspect and list every unfinished item with an estimated cost (site visit report).
  3. Collect final lien waivers from everyone who worked on the property.
  4. Compute the exposure if the borrower stopped now: unfinished work plus unpaid bills.
  5. Hold back enough to cover it, and release the rest when conditions are met.

A worked example

Example (illustrative arithmetic, not a standard)

A $60,000 holdback paid in four draws of $15,000. At the final request the work looks 95% done. The inspector lists $3,500 of unfinished punch-list items. A subcontractor has not been paid and could file a $4,000 lien. So the exposure is $3,500 + $4,000 = $7,500. Held funds sit undrawn for 45 days, and the loan rate is 11%. Every figure is a made-up round number.

Policy Held back Exposure not covered Interest not earned (45 days)
A: release the final draw on photos $0 $7,500 $0
B: 10% retainage on all draws ($6,000) until completion $6,000 $1,500 $81
C: retainage plus 150% of the punch list ($6,000 + $5,250) $11,250 $0 $153

Policy B covers $6,000 of the $7,500, leaving $1,500 exposed. Policy C holds enough to cover the whole exposure with $3,750 to spare. The cost of C over A is $153 of interest not earned on funds you have not advanced, which is small next to $7,500 (draw review checklist).

The price is borrower friction: a contractor who wants the last payment and a borrower who wants a sale. That is why the rules must be in the documents from the start and applied the same way on every loan, with the release conditions stated plainly (closing out a loan).

Making it routine

  1. Put retainage and final-release conditions in every draw agreement, checked by an attorney.
  2. Require a final inspection report and lien waivers before the last release.
  3. Release the holdback in writing when the conditions are met, and keep the record.
  4. Review how much was held back and why at the end of each loan (draw inspections).

Run your own numbers

Use the free fix-and-flip loan sizer below to see the holdback and draw sizes on a loan before you plan its final release.

Quick answers

Why hold anything back on the last draw?

Because the last draw is when the borrower and contractor have the least reason to finish. A holdback keeps money available to complete the work or clear unpaid bills if someone walks away.

What is retainage?

A percentage of each draw, often held until the work is complete. The right amount, and whether it may be used on a particular project, is set by the contract and by state law.

What should I collect before the final release?

Evidence the work is complete, lien waivers from the people who worked on the property, and any final inspection or sign-off the project requires ([lien waivers](/blog/lien-waivers-lender-draws)).

Does holding money back cost the lender anything?

A little: interest you do not earn on money not yet advanced, and the time to manage the release. Compare it with the exposure.

Do the numbers in this guide apply to my loans?

No. The draw sizes, retainage, punch list and lien amounts are made up for the example. They are not advice about any project.

See DeskTech Lending →

Keep reading

Private and hard money lending

A Standard Loan Package: The Loan Count Where It Pays

Learn how to compare the one-time cost of a standard loan document package with the per-loan cost of custom documents, and the loan count where it pays.

· 2 min read

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.