Cover the Basement Window Wells at Turnover: The Odds

By DeskTech HQ · · 1 min read

A window well fills with rain and leaves, and the water finds the window. A cover costs about thirty dollars and ten minutes. The question is how likely a water-entry event is for the cover to pay.

The steps

  1. Price the cover: cost + minutes × the value of your time.
  2. Price a water-entry event: cleanup and repair.
  3. Break-even chance = setup cost ÷ event cost.
  4. Check the sump too (pour water into the sump pit).

A worked example

Example (illustrative arithmetic, not predictions)

The cover costs $30 plus 10 minutes at $60 an hour ($10): $40. A water-entry event costs $1,000 to clean and repair. Every figure is a made-up round number.

Chance of a water-entry event Expected cost avoided (chance × $1,000) Avoided − $40
2% $20 −$20
4% $40 $0 (break-even)
8% $80 +$40
12% $120 +$80

The cover pays at a 4% chance of a water-entry event: $40 ÷ $1,000. On a house with below-grade windows, it is plausible.

Choose a cover that still lets the window open if it is a means of escape, fit it so rain runs off, and clear the well of leaves first. Check local code before you cover an escape window.

Making it routine

  1. Clear the well of leaves and debris.
  2. Choose a cover that does not block escape.
  3. Fit it so rain runs off.
  4. Check local code.

Run your own numbers

Use the free BRRRR calculator below to see how avoided repairs affect a hold.

Quick answers

What does a well cover do?

It keeps rain, leaves and snow out of the window well.

How do I price it?

The cover plus the minutes to fit it.

What does a water-entry event cost?

Cleanup and repair of a flooded basement.

What is the break-even chance?

The setup cost divided by the event cost.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.