A Signed Punch List Before the Final Draw: The Odds

By DeskTech HQ · · 1 min read

The contractor says the job is finished. The borrower has a list of eleven things. Each side remembers the list differently. A written, signed punch list ends the argument. Drafting and collecting signatures takes about twenty minutes. The question is how likely a completion dispute is for the list to pay.

The steps

  1. Price the list: minutes × the value of your time.
  2. Price a completion dispute: arguments and delay.
  3. Break-even chance = list cost ÷ dispute cost.
  4. Set the holdback against it (retainage: 10 or 5 percent).

A worked example

Example (illustrative arithmetic, not predictions)

The list takes 20 minutes at $60 an hour: $20. A completion dispute would cost $500. Every figure is a made-up round number.

Chance of a completion dispute without a signed list Expected cost avoided (chance × $500) Avoided − $20
2% $10 −$10
4% $20 $0 (break-even)
8% $40 +$20
15% $75 +$55

The list pays at a 4% chance of a completion dispute: $20 ÷ $500. On a rehab with a long tail of small items, that is plausible.

Walk the property with the borrower and contractor, write each remaining item with a short description and a due date, and have both sign and date it. Release the holdback against the list and photos, as the loan documents allow. The list records what the parties agree; it does not change the contract.

Making it routine

  1. Walk the property with both parties.
  2. List each item with a due date.
  3. Have both sign and date it.
  4. Release the holdback as the documents allow.

Run your own numbers

Use the free fix-and-flip loan sizer below to see the amount held against open items at the final draw.

Quick answers

What is a signed punch list?

A written list of remaining items that the borrower and contractor both sign.

How do I price it?

The minutes to draft and collect signatures.

What does a completion dispute cost?

Arguments about what was left, and delay to the final draw.

What is the break-even chance?

The list's cost divided by the dispute cost.

Do the numbers in this guide apply to my draws?

No. The time, cost and odds are made up for the example. They are not predictions.

Keep reading

This guide is general education, not legal, tax, or financial advice. Talk with a licensed professional about your situation.