Pricing Rural Collateral: What a Longer Sale Adds to Rate
A loan on a house in a small town and a loan on a house in a busy suburb may look the same on paper. If both fail, the town house may take months longer to sell. The longer sale costs the lender interest and carrying costs. The question is how much that adds to the price of the loan, and how to do it fairly.
The steps
- Estimate the extra days a property of this kind would take to sell after a default, from sales data you can document.
- Price the extra loss: lost interest on the loan for those days plus carrying costs.
- Multiply by the chance of default to get the expected extra loss per loan.
- Divide by the loan’s dollar-years (loan amount times the term in years). That is the rate difference.
- Consider a lower loan-to-value or a limit on loan size instead of, or with, a rate (LTV cushion).
A worked example
Example (illustrative arithmetic, not benchmarks)
A $150,000 loan at 11% for 8 months. A default on the rural property takes 60 more days to resolve. Lost interest: $150,000 × 11% × 60 ÷ 365 = $2,712. Extra carrying cost (taxes, insurance, upkeep): $1,500. Extra loss in a default: $4,212. Dollar-years: $150,000 × 8 ÷ 12 = $100,000. Every figure is a made-up round number.
| Chance of default | Expected extra loss (× $4,212) | Rate difference (÷ $100,000) |
|---|---|---|
| 3% | $126 | 0.13 points |
| 5% | $211 | 0.21 points |
| 10% | $421 | 0.42 points |
At a 5% chance of default, the extra sale time justifies about a fifth of a percentage point on the yearly rate. That is small. It would not change many borrowers’ decisions, and it is smaller than the rate steps most lenders use. Lowering the loan-to-value by a few points does the same job with a clear link to the property.
The method matters more than the number. A difference in price should come from a documented, property-level feature, such as the typical days to sell for properties of that kind, and not from the neighborhood or from who lives there. It should apply to every borrower with that property the same way. Have a qualified attorney review the policy before using it; geography-based pricing is an area where good intentions can still cause legal trouble (pricing by risk tier).
Making it routine
- Write the policy and its documented basis.
- Apply it to every loan the same way.
- Prefer loan-to-value and loan-size limits where they address the same risk.
- Have an attorney review the policy.
Run your own numbers
Use the free fix-and-flip loan sizer below to see how loan-to-value changes the exposure on a loan.