Replace the Doorbell Button at Turnover: The Odds

By DeskTech HQ · · 1 min read

A doorbell that does not ring is a small thing that generates a call in the first month. Testing it at turnover takes a minute, and a new button costs a few dollars. The question is how likely a complaint is for the work to pay.

The steps

  1. Price the work: the button plus minutes to fit it.
  2. Price a call about the doorbell: the call, the trip and goodwill.
  3. Break-even chance = work cost ÷ call cost.
  4. Compare with the age of the button and your call log (the cost of turnover).

A worked example

Example (illustrative arithmetic, not quotes or predictions)

The work costs $6 in a button and time. A call would cost $60. Every figure is a made-up round number.

Chance of a doorbell call in the first month Expected call cost avoided (chance × $60) Avoided − $6
5% $3 −$3
10% $6 $0 (break-even)
20% $12 +$6
40% $24 +$18

The work pays at a 10% chance of a call: $6 ÷ $60. A corroded or sticky button is likely to exceed it.

Press the button and listen for the chime at every turnover. If the button is the problem, replace it. If the chime is silent with a good button, the transformer or chime unit may have failed, which is work for an electrician.

Making it routine

  1. Press the button at every turnover.
  2. Replace worn buttons.
  3. Call an electrician if the chime or transformer fails.
  4. Log the date.

Run your own numbers

Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.

Quick answers

Why replace the button?

A worn or corroded button fails and draws a call.

How do I price it?

The button plus the minutes to fit it.

What is the break-even chance?

The cost divided by the cost of a call.

Is it only the button?

The chime and the transformer can also fail. Test all three.

Do the numbers in this guide apply to my rental?

No. The costs and odds are made up for the example. They are not quotes or predictions.