Garbage Disposal: Repair or Replace? The Years
A jammed or leaking garbage disposal can be reset, freed or repaired for a little money. A new unit costs more and lasts longer. The question is how many years a new disposal must last to be the cheaper choice.
The steps
- Cost per year of the repair = its cost ÷ the years it buys.
- Break-even life of the new unit = its installed price ÷ the repair’s cost per year.
- Compare with how long disposals last in your rentals.
- Add the cost of repeat calls to the repair (appliance repair or replace: the repair cost cap).
A worked example
Example (illustrative arithmetic, not quotes or product claims)
A repair costs $20 and buys 1 year, $20 a year. A new disposal installed costs $140. Every figure is a made-up round number.
| Years the new disposal lasts | New unit cost per year ($140 ÷ years) | Repair $20 − new unit |
|---|---|---|
| 5 | $28.00 | −$8.00 (repair cheaper) |
| 7 | $20.00 | $0 (break-even) |
| 10 | $14.00 | +$6.00 (replace cheaper) |
The new disposal has to last 7 years to match yearly repairs: $140 ÷ $20. In a rental with careful tenants, that is plausible.
If the same unit has jammed three times, replace it. If it is the first jam, free it with the hex key and reset button and add a note for the tenant. Skip the disposal entirely where the sink drains poorly and fix the plumbing first (the cost of turnover).
Making it routine
- Try the reset and the hex key first.
- Replace after repeated jams or a leak.
- Leave a note on what not to put down it.
- Use a licensed professional where required.
Run your own numbers
Use the free BRRRR calculator below to see how small yearly costs per unit add up across a building.