Tub Refinish or Replace: The Years a New Tub Must Last
A stained or chipped tub can be refinished or replaced. Refinishing is cheap and wears out. Replacing costs much more and lasts decades. The question is how many years a new tub must last to be the cheaper choice.
The steps
- Cost per year of the refinish = its cost ÷ the years it lasts.
- Break-even life of the new tub = its cost ÷ the refinish’s cost per year.
- Compare with how long you will own the unit.
- Check that the tub is sound enough to refinish (a capex reserve by system age).
A worked example
Example (illustrative arithmetic, not quotes or product claims)
A refinish costs $360 and lasts 6 years in a rental, $60 a year. A new tub installed costs $1,440. Every figure is a made-up round number.
| Years the new tub lasts | New tub cost per year ($1,440 ÷ years) | Refinish $60 − new tub |
|---|---|---|
| 15 | $96.00 | −$36.00 (refinish cheaper) |
| 24 | $60.00 | $0 (break-even) |
| 30 | $48.00 | +$12.00 (replace cheaper) |
The new tub has to last 24 years to match the refinish: $1,440 ÷ $60. Over a hold shorter than that, the refinish is the cheaper choice.
If the tub is cracked, rusted through or has a soft floor, the refinish will fail and the comparison changes. Replace in that case, and plan for the wall tile and the plumbing around it (the cost of turnover).
Making it routine
- Check the tub for cracks and soft spots at turnover.
- Refinish a sound tub and let it cure.
- Replace a failed tub.
- Note the date and the result.
Run your own numbers
Use the free BRRRR calculator below to see how a bathroom update changes a rental’s cash flow.